Fuelling Facility – Croft Street, Preston Depot
April 2016 - December 2016
£280,000
Buckingham Group / Network Rail
Key Project Features
- Fuel, Oil and Coolant System
- Power Points
- Electrical Services Distribution Systems
- External Lighting Systems
- Lighting Controls System
Description of Project
The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Croft Street Depot, Preston is one of the four Network Rail owned depots to be upgraded and have fuelling system installed in order to facilitate the fuelling and servicing of the rolling stock. The project includes the coordination of piped services and electrical supplies to equipment and lighting.
Design Services Provided
- Existing M&E Surveys
- Conceptual Design To As Built
- LV Distribution
- Lighting
- Earthing & Bonding
- Fuel Dispenser
- Fuel, Oil & Coolant System
- Low level external task lighting
- Fuel monitoring systems
View more case studies
Howdon Satellite Depot
With the existing Nexus Metro depot at Gosforth, North Tyneside undergoing redevelopment works, Howdon needed to be brought online as an additional depot facility quickly and safely.
Plymouth Laira Depot
Laira TMD is a railway Traction Maintenance Depot situated in Plymouth, Devon, operated by Great Western Railway (GWR).
Blackpool Depot
This project involved the replacement of existing depot services including sanding, CET, Carriage Wash Machine & tanking water to the new servicing aprons.
Blackburn Depot
The Northern Hub programme was developed to increase capacity, line speed & connectivity throughout the North West. Blackburn is a new depot introduced to accommodate the additional rolling stock.
Bombardier Transport V-Shop
A new 10,000m² facility for Bombardier Transportation in Derby to enable the final test and sale of trains for the Crossrail project.
Euston Station Remodel
The project consisted of the provision of new – and the refurbishment of existing – retail spaces at Euston Station.
Northampton Castle Station Redevelopment
A new ‘gateway’ station building and footbridge has been constructed to replace the existing station along with associated works including the demolition of the existing station.
Wakefield Westgate Station Redevelopment
The station comprises a new station building, forecourt, road access and drop-off and collection areas. A new passenger footbridge forms part of the town’s Westgate Key Development Area Redevelopment.
Northern Hub Electrification – Allerton Depot
Allerton is one of the four Network Rail owned depots to be upgraded and have OLE reinstated in order to facilitate the maintenance of the additional electric rolling stock.
Leyland Carriage Sidings
Leyland Carriage sidings is one of the four Network Rail owned depots to be upgraded in order to facilitate the maintenance and servicing of the additional rolling stock.