by Editor | Jul 6, 2026 | Case Studies, M&E, Rail Depot Systems
Westgate Station, Wakefield Completed Value Circa £1.5m Project Station Redevelopment Client Buckingham Group Contracting The station provides the main line service to Wakefield, lying on the main line between Leeds and Doncaster; Virgin Trains are the train...
by Editor | Jul 6, 2026 | Case Studies, Rail Depot Systems
Preston Depot Completed 2016 Value Circa £280k Project Depot Maintenance Client Buckingham Group / Network Rail The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Croft Street Depot,...
by Editor | Jul 6, 2026 | Case Studies, Rail Depot Systems
Leyland Carriage Sidings Completed Value Circa £970k Project Rail Depot Maintenance Client Buckingham Group / Network Rail The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Leyland...
by Editor | Jul 3, 2026 | Case Studies, Rail Depot Systems
Allerton Depot Completed Value Circa £2.77m Project Rail Depot Maintenance Client Buckingham Group Contracting The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Allerton Depot is...
by Editor | Jul 2, 2026 | Case Studies, Rail Depot Systems
Howdon Satellite Depot Completed Value Circa £70m Project Additional Depot Facility Client Buckingham Group (Contracting for Nexus) With the existing Nexus Metro depot at Gosforth, North Tyneside undergoing redevelopment works and with an expanded fleet of...
by Editor | Jun 19, 2026 | Case Studies, Rail Depot Systems
Etches Park Depot Improvement Completed Value Project Client Emeg® Group is pleased to announce that we were recently appointed by Buckingham Group Contracting to undertake a comprehensive schedule of improvement work at the Etches Park rail depot in Derby for...