by Editor | Jul 7, 2026 | Case Studies, M&E, Shore Supplies
Taunton Shore Supply Units Completed 2026 Value Circa £825k Project Mobile Shore Supply Units Client Great Western Railway (GWR) Emeg designed, manufactured and commissioned a batch of proprietary Emeg e-Shore™ 440V Mobile Shore Supply Units for Great Western...
by Editor | Jul 7, 2026 | Case Studies, M&E
Reading Points Heating Completed 2026 Value Circa £1.2m Project Points Heating System Installation Client Great Western Railway (GWR) Emeg Group was appointed by Great Western Railway (GWR) to design and install a points heating system at Reading Cow Lane Rail...
by Editor | Jul 6, 2026 | Case Studies, M&E, Rail Depot Systems
Westgate Station, Wakefield Completed Value Circa £1.5m Project Station Redevelopment Client Buckingham Group Contracting The station provides the main line service to Wakefield, lying on the main line between Leeds and Doncaster; Virgin Trains are the train...
by Editor | Jul 6, 2026 | Case Studies, M&E, Shore Supplies
Neville Hill Depot Completed Shore Supplies Value Circa £687k Project Client Galliford Try / Network Rail The project consisted of the removal & replacement of electrical distribution equipment & cabling relating to the existing 850V Shore Supply...
by Editor | Jul 6, 2026 | Case Studies, Rail Depot Systems
Preston Depot Completed 2016 Value Circa £280k Project Depot Maintenance Client Buckingham Group / Network Rail The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Croft Street Depot,...
by Editor | Jul 6, 2026 | Case Studies, M&E, Stations
Northampton Castle Station Redevelopment Completed Value Circa £1.9m Project Station Redevelopment Client Buckingham Group A new ‘gateway’ station building and footbridge has been constructed to replace the existing Station along with associated works...