by Editor | Jul 6, 2026 | Case Studies, Rail Depot Systems
Leyland Carriage Sidings Completed Value Circa £970k Project Rail Depot Maintenance Client Buckingham Group / Network Rail The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Leyland...
by Editor | Jul 6, 2026 | Case Studies, Stations
Euston Station Remodel Completed Value Circa £2.3m Project Station Redevelopment Client Balfour Beatty The project consisted of the provision of new retail spaces and the refurbishment of existing retail spaces at Euston Station. The new retail areas were...
by Editor | Jul 6, 2026 | Case Studies, M&E
Bombardier Transport V-Shop Completed Value Circa £3.3m Project Facility Redevelopment Client Balfour Beatty A new 10,000m² facility for Bombardier Transportation in Derby to enable the final test and sale of trains for the Crossrail project. The facility...
by Editor | Jul 3, 2026 | Case Studies, Rail Depot Systems
Allerton Depot Completed Value Circa £2.77m Project Rail Depot Maintenance Client Buckingham Group Contracting The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Allerton Depot is...
by Editor | Jul 2, 2026 | Case Studies, Rail Depot Systems
Howdon Satellite Depot Completed Value Circa £70m Project Additional Depot Facility Client Buckingham Group (Contracting for Nexus) With the existing Nexus Metro depot at Gosforth, North Tyneside undergoing redevelopment works and with an expanded fleet of...
by Editor | Jul 2, 2026 | Case Studies, Renewables
SCC Data Centre (Birmingham) 737kW System 1822 Solar Panels 100kW Inverters 146t CO2 Saved Per Year This project covered the installation of a 737.91kWp roof mounted solar array for a long-term partner at the SCC Data Centre in Tyseley, Birmingham. The scheme was...