Taunton Shore Supply Units

Completed

2026

Value

Circa £825k

Project

Mobile Shore Supply Units

Client

Great Western Railway (GWR)

Emeg designed, manufactured and commissioned a batch of proprietary Emeg e-Shore™ 440V Mobile Shore Supply Units for Great Western Railway, including deployment at Taunton Depot.

The units provide external 400V three-phase power to trains stabled in depots, stations and sidings, allowing onboard electrical systems to remain operational while diesel engines are switched off, significantly reducing noise and emissions.

Designed exclusively by Emeg, the e-Shore™ range combines advanced safety features with full compliance to current Network Rail standards, providing a reliable and sustainable shore power solution for modern rail operations.

Key Project Features

  • Proprietary Emeg e-Shore™ 440V Mobile Shore Supply Units
  • External 400V three-phase shore power supply
  • Integrated automated pre-energisation testing
  • Earth fault and leakage monitoring
  • Load limiting protection
  • Manufacture and commissioning of multiple units
  • Deployment across GWR depots, including Taunton
  • Reduced train idling, noise and emissions
  • Fully compliant with Network Rail standards.

Design Services Provided

  • Product design and development
  • Mechanical and electrical engineering
  • Control panel design
  • Electrical safety systems integration
  • Manufacture of proprietary equipment
  • Factory testing and quality assurance
  • Commissioning
  • Compliance with Network Rail 400V AC Shore Supply standards.
Wakefield Westgate station
Wakefield Westgate Station Redevelopment
Wakefield Westgate Station Redevelopment

Project Challenges

The project required every unit to meet the latest Network Rail standards for 400V three-phase AC Shore Supply Equipment, incorporating integrated safety testing, continuous earth fault and leakage monitoring, and load limiting.

Thanks to Emeg’s established product design and manufacturing expertise, the units were produced, commissioned and deployed without issue.

Project Outcome

The project successfully delivered a batch of Emeg’s proprietary e-Shore™ Mobile Shore Supply Units to Great Western Railway, providing a sustainable solution that enables trains to remain fully powered while stationary without running diesel engines.

Drawing on more than 20 years of experience supplying shore power equipment to the rail industry, Emeg delivered a reliable, compliant and environmentally beneficial solution that supports modern depot operations.