Blackburn Depot
The Northern Hub programme was developed to increase capacity, line speed & connectivity throughout the North West. Blackburn is a new depot introduced to accommodate the additional rolling stock.
Bombardier Transport V-Shop
A new 10,000m² facility for Bombardier Transportation in Derby to enable the final test and sale of trains for the Crossrail project.
Euston Station Remodel
The project consisted of the provision of new – and the refurbishment of existing – retail spaces at Euston Station.
Northampton Castle Station Redevelopment
A new ‘gateway’ station building and footbridge has been constructed to replace the existing station along with associated works including the demolition of the existing station.
Wakefield Westgate Station Redevelopment
The station comprises a new station building, forecourt, road access and drop-off and collection areas. A new passenger footbridge forms part of the town’s Westgate Key Development Area Redevelopment.
Fuelling Facility – Croft Street, Preston Depot
The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Croft Street Depot, Preston is one of the Network Rail owned depots to be upgraded and have a new fuelling system installed.
Northern Hub Electrification – Allerton Depot
Allerton is one of the four Network Rail owned depots to be upgraded and have OLE reinstated in order to facilitate the maintenance of the additional electric rolling stock.
Leyland Carriage Sidings
Leyland Carriage sidings is one of the four Network Rail owned depots to be upgraded in order to facilitate the maintenance and servicing of the additional rolling stock.
Neville Hill Depot
The project consisted of the removal & replacement of electrical distribution equipment & cabling relating to the existing 850V Shore Supply installation.
Etches Park Depot – New Refuelling System
The system included both rail and road off-loading systems, 400,000 litres of new fuel storage, a new fuel pump room, a new fully automatic control system, and new dispensing lines connected to both existing and new fuel dispensers.
Emeg Achieves Constructionline Gold Membership Status
Emeg has been awarded Level 3 Constructionline Gold Membership status. In order to achieve this prestigious Gold standard Emeg had to qualify across all aspects of the business in order to attain this milestone. Emeg’s Managing Director Richard Simmonite...
Emeg Appoints a New Bid Manager
Emeg is very pleased to announce the appointment of Jason Mitchell the Companies Bid Manager. Jason has worked within the building services industry for the last 27 years commencing as an apprentice trained electrician, supervisor and then Project Manager...