by Carl Backhouse | Aug 31, 2021 | Case Studies, Depot Protection, Design, M&E, Rail Depot Systems
Howdon Satellite Depot November 2020 £70 Million Buckingham Group Contracting for Nexus Key Project Features Preferred M&E service provider Dedicated on-site project management Innovative bespoke solutions Delivered on time & on budget Health &...
by Carl Backhouse | Oct 17, 2019 | AdBlue, Case Studies, CET, Design, Fuel, M&E, Oil and Coolant, Rail Depot Systems
Plymouth Laira Depot October 2018 £1.8 Million Great Western Railways Key Project Features Controlled Emission Toilets (CET) Apron hot & cold water points Plantroom domestics Fuel, engine oil, hydraulic oil, coolant & AdBlue fuel additive Description of...
by Carl Backhouse | Jul 3, 2018 | Case Studies, Design, M&E
Blackpool Depot March 2017 - April 2018 £3.1 Million Volker Rail Key Project Features e-wash™ CWM Tanking water Automatic sanding system e-vac™ Controlled Emission Toilets (CET) CWM water recycling system Description of Project The Northern Hub programme was...
by Carl Backhouse | Jul 3, 2018 | Case Studies, Design, M&E, Train Wash
Blackburn Depot Sept 2016 - August 2017 £2.9 Million Buckingham Group Contracting Key Project Features e-wash™ CWM e-vac ™ CET & Tanking Water System Fuel, Oil & Coolant System e-mix™ AdBlue System Apron Hot & Cold Water Points Lighting LV...
by Carl Backhouse | Jul 3, 2018 | Case Studies, Design, Heating & Cooling, Lighting, M&E, Ventilation
Bombardier Transport V-Shop June 2014 - June 2016 £3.32 Million Balfour Beatty Key Project Features: 33kV, 25kV & 6.6kV HV substation/ switchgear & distribution HV/LV transformed power supplies Operational interlock system 25kV overhead lines (OLE) High...
by Carl Backhouse | Jun 28, 2018 | Case Studies, M&E, Stations
Euston Station Remodel Sept 2014 - May 2016 £2.385 Million Balfour Beatty Key Project Features Existing M&E Surveys Relocation of Existing Services LV Distribution & Containment Lighting incl. Standby & Emergency General Power & Data Above...