Neville Hill Depot – 850V Shore Supplies
November 2011 - June 2016
£687,000
Galliford Try / Network Rail
Key Project Features
- 2000kVA 11,000/850V Transformer
- 850V 3-Phase MCCB Switchboard c/w IT Earth Resistor
- 5No 850V 1-Phase Lineside Pillars
- 5No 850V 1-Phase Ground Boxes
- 5No 850V 1-Phase Plug/Sockets
- Shore Supply Control System
- Earthing & Bonding
Description of Project
The project consisted of the removal & replacement of electrical distribution equipment & cabling relating to the existing 850V Shore Supply installation that was well beyond its usable life.
The installation generally comprised of new transformer, switchboard, lineside pillars, ground boxes, plug/sockets & all associated cabling.
Design Services Provided
- Survey of existing electrical distribution
- Designs produced using the design process as defined in NR/SP/CIV/003 Form 001 to 003
- Design of new electrical distribution system to accommodate 5no new 850V Shore Supplies
- Design of new UTX & troughing routes
- Upgrade of the existing Earthing & Bonding system in accordance with NR/SP/ELP/21085
View more case studies
Howdon Satellite Depot
With the existing Nexus Metro depot at Gosforth, North Tyneside undergoing redevelopment works, Howdon needed to be brought online as an additional depot facility quickly and safely.
Plymouth Laira Depot
Laira TMD is a railway Traction Maintenance Depot situated in Plymouth, Devon, operated by Great Western Railway (GWR).
Blackpool Depot
This project involved the replacement of existing depot services including sanding, CET, Carriage Wash Machine & tanking water to the new servicing aprons.
Blackburn Depot
The Northern Hub programme was developed to increase capacity, line speed & connectivity throughout the North West. Blackburn is a new depot introduced to accommodate the additional rolling stock.
Bombardier Transport V-Shop
A new 10,000m² facility for Bombardier Transportation in Derby to enable the final test and sale of trains for the Crossrail project.
Euston Station Remodel
The project consisted of the provision of new – and the refurbishment of existing – retail spaces at Euston Station.
Northampton Castle Station Redevelopment
A new ‘gateway’ station building and footbridge has been constructed to replace the existing station along with associated works including the demolition of the existing station.
Wakefield Westgate Station Redevelopment
The station comprises a new station building, forecourt, road access and drop-off and collection areas. A new passenger footbridge forms part of the town’s Westgate Key Development Area Redevelopment.
Fuelling Facility – Croft Street, Preston Depot
The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Croft Street Depot, Preston is one of the Network Rail owned depots to be upgraded and have a new fuelling system installed.
Northern Hub Electrification – Allerton Depot
Allerton is one of the four Network Rail owned depots to be upgraded and have OLE reinstated in order to facilitate the maintenance of the additional electric rolling stock.