COVID-19 AVAILABILITY ANNOUNCEMENT
Important message from the Managing Director – Mr Richard Simmonite
“Emeg realise the importance to the nation of securing the robustness of the UK rail infrastructure in these unprecedented times and would reiterate our full commitment in offering our ongoing services to all of our clients, with our willingness and availability to assist wherever and whenever possible.
Working in line with the current health and safety guidelines as set out by the government, we are here and able to offer services as set out below.”
Pre-Construction
Contact:
Tim Burrell
Pre Contracts Director
07973 316665
Cost & Project Planning for Electrical, Mechanical & HVAC, Depot Plant including Carriage Wash, CET and Tanking Supplies, Depot Protection, Fuel, Oil and Lube Systems, Shore Supplies and all ME&P Upgrades.
Design
Contact:
Carl Backhouse
Operations Director
07507 515981
- Mechanical, Electrical & Plumbing
- Depot Systems
- Building Information Modelling
- Revit & Clash Detection
- Computational Fluid Dynamics
- SBEM Modelling and Certification
- Renewable Energy
Site Installation
Contact:
Carl Backhouse
Operations Director
07507 515981
- Electrical, Mechanical, HVAC
- Plumbing Engineers
- Carriage Wash
- Depot Protection
- CET Engineers, Oil, Lube & Fuelling Engineers
- Shore Supplies Engineering
Maintenance
Contact:
Graham Mansell
Maintenance Manager
07581 430984
- 24/7/365 National Maintenance Teams
- All Low Voltage Electrical Systems
- Mechanical and HVAC Installations
- Depot Plant & Machinery