Howdon Satellite Depot
November 2020
£70 Million
Buckingham Group Contracting for Nexus
Key Project Features
- Preferred M&E service provider
- Dedicated on-site project management
- Innovative bespoke solutions
- Delivered on time & on budget
- Health & Safety top priority
- No on-site accidents
Description of Project
With the existing Nexus Metro depot at Gosforth, North Tyneside undergoing redevelopment works and with an expanded fleet of rail vehicles, Howdon needed to be brought online as an additional depot facility where Metro vehicles could be stabled overnight and new rolling stock received.
The Howdon depot also needed to provide cleaning and light maintenance facilities while improvement works were underway at Gosforth. Emeg were responsible for undertaking the detailed design, installation and coordination of the mechanical and electrical installations required to create a suitable environment within the depot sidings, workshop and office facilities.
Project Background
Buckingham Group Contracting Ltd (BGCL) were appointed by Nexus as the design and build contractor for the complete scheme and contracted Emeg as their preferred railway M&E engineering services provider.
Emeg were responsible for undertaking the detailed design, installation and coordination of the mechanical & electrical services installations required to create a suitable environment within the depot sidings, the workshop and office facilities within the accommodation building.
This included:
- safeNet Depot Protection System (DPS)
- Points heating
- Automatic derailer
- Mechanical & electrical services
- LV distribution & earthing
- Lighting, telecoms & fire protection
- Gas & water supply
- Ventilation & drainage
- Heating & cooling
- Building Management System (BMS)
safeNet Depot Protection System (DPS)
An Emeg safeNet Depot Protection System (DPS) was installed to protect the depot staff from any unauthorised train movements into the workshop. This was achieved by using an automatic derailer located on the protected road, which prevents trains from moving into the workshop unless ALL staff are logged off the road via the Emeg safeNET depot protection system.
The EMEG safeNet DPS is based around a system of ‘Data Keys’ to allow personnel at the depot to work safely on a specific road within the workshop. The automatic derailer will serve to protect the road into the workshop and will normally be held in the ‘UP’ position, which is the derail position, until the DPS is turned ‘OFF’ at the ROLO panel by the authorised depot personnel. The Emeg safeNet DPS system is also capable of interfacing with the workshop bi-fold doors, such that a movement cannot take place unless the doors are proved to be fully open. The bi-fold door suppliers control unit shall have volt free contacts available to provide “DOORS OPEN” & “DOORS CLOSED” outputs to confirm the door status to the DPS system.
All works carried out by Emeg were conducted with Health & Safety as an absolute priority, ensuring that the day to day programming was met and the project was delivered on time, notwithstanding the challenges caused at the height of the COVID-19 pandemic. A thorough knowledge of depot systems and dedicated on-site management meant that BGCL had trust in Emeg when it came to integrating these works. The use of our dedicated design team coupled with our innovative bespoke solutions allowed Emeg to deliver the client’s requirements at Howden Depot on time, on budget and with no on-site accidents.
“It’s been a collaborative effort, delivered on time, and we’ve produced something we can all really be proud of.”
Tabitha Callaghan, Project Manager, Nexus
View more case studies
Plymouth Laira Depot
Laira TMD is a railway Traction Maintenance Depot situated in Plymouth, Devon, operated by Great Western Railway (GWR).
Blackpool Depot
This project involved the replacement of existing depot services including sanding, CET, Carriage Wash Machine & tanking water to the new servicing aprons.
Blackburn Depot
The Northern Hub programme was developed to increase capacity, line speed & connectivity throughout the North West. Blackburn is a new depot introduced to accommodate the additional rolling stock.
Bombardier Transport V-Shop
A new 10,000m² facility for Bombardier Transportation in Derby to enable the final test and sale of trains for the Crossrail project.
Euston Station Remodel
The project consisted of the provision of new – and the refurbishment of existing – retail spaces at Euston Station.
Northampton Castle Station Redevelopment
A new ‘gateway’ station building and footbridge has been constructed to replace the existing station along with associated works including the demolition of the existing station.