by Editor | Jul 3, 2018 | Case Studies, Design, M&E, Train Wash
Blackburn Depot £2.9 Million Buckingham Group Contracting Key Project Features e-wash™ CWM e-vac ™ CET & Tanking Water System Fuel, Oil & Coolant System e-mix™ AdBlue System Apron Hot & Cold Water Points Lighting LV Distribution Telecoms...
by Editor | Jul 3, 2018 | Case Studies, Design, Heating & Cooling, Lighting, M&E, Ventilation
Bombardier Transport V-Shop £3.32 Million Balfour Beatty Key Project Features: 33kV, 25kV & 6.6kV HV substation/ switchgear & distribution HV/LV transformed power supplies Operational interlock system 25kV overhead lines (OLE) High level gas radiant...
by Editor | Jun 28, 2018 | Case Studies, M&E, Stations
Euston Station Remodel £2.385 Million Balfour Beatty Key Project Features Existing M&E Surveys Relocation of Existing Services LV Distribution & Containment Lighting incl. Standby & Emergency General Power & Data Above Ground Drainage Cold...
by Editor | Jun 28, 2018 | Case Studies, Stations
Northampton Castle Station Redevelopment £1.998 Million Buckingham Group Key Project Features HV/LV transformed power supply Isolated Earthing & Bonding systems to new NWR standards HVAC Services Systems BMS Control Systems Electrical Services Distribution...
by Editor | Jun 27, 2018 | Case Studies, Stations
Wakefield Westgate Station Redevelopment £1.520,000 Buckingham Group Contracting Key Project Features HV/LV transformed power supply Isolated Earthing & Bonding systems to new NWR standards HVAC Services Systems BMS Control Systems Electrical Services...