01246 268678 sales@emeg.co.uk

Blackburn Depot - King Street

Completed

Value

Circa £2.9m

Project

Station Redevelopment

Client

Buckingham Group Contracting

The Northern Hub programme was developed to increase capacity, line speed and connectivity throughout the North West of England. Blackburn’s King Street Depot is a brand new depot that has been introduced to assist in accommodating the additional rolling stock.

The project includes a 12-rotor brush e-wash™ CWMe-vac™ automatic CET system, tanking water, fuel, oil, coolant and AdBlue storage and dispensing systems, hot & cold water points, sitewide M&E, telecoms, fire alarm, access control, CCTV and powerpoints.

Key Project Features

  • e-wash™ CWM
  • e-vac ™ CET & Tanking Water System
  • Fuel, Oil & Coolant System
  • e-mix™ AdBlue System
  • Apron Hot & Cold Water Points
  • Lighting
  • LV Distribution
  • Telecoms
  • Accommodation & Plantroom Fire Alarm
  • Access Control.

Design Services Provided

  • Site Surveys
  • Conceptual Design to ‘As Built’
  • e-wash™ CWM
  • e-vac™ CET & Tanking Water System
  • Fuel, Oil & Coolant System
  • e-mix™ AdBlue System
  • Apron Hot & Cold Water Points
  • Plantroom Domestics
  • Lighting
  • LV Distribution
  • Earthing & Bonding
  • Telecoms
  • Accommodation & Plantroom Fire Alarm
  • Access Control.
Wakefield Westgate station
Rail depot fuel tanks
e-fuel train fuel pumps

Need MEP design support for your next project?