Hereford County Council
50kW System
111 Panels
40kW Inverters
10t CO2 Saved Per Year
Working for Hereford Council, we undertook the installation of a 50kWp roof mounted solar system at Hillside Intermediate Care Centre after winning a competitive tender.
The scheme consisted of 111 Longi 450W panels mounted over six elevations with a central Solis 40kW 5G string inverter; the scheme utilised an export power manager setting the site max export limit to 11kW.
The panels were mounted via proprietary pitched tiled roof rail with 25 degrees inclination and the scheme was completed with an on-site period of five days, including provision of a generator inter trip system.
The installation delivers annual carbon savings of over 10 tonnes with a payback period of eight years.