Bombardier Transport V-Shop
Completed
Value
Circa £3.3m
Project
Facility Redevelopment
Client
Balfour Beatty
A new 10,000m² facility for Bombardier Transportation in Derby to enable the final test and sale of trains for the Crossrail project.
The facility comprises 4 roads separately controllable and interlocked, complete with full length under-carriage inspection pits with lighting and power.
In addition, an adjoining 2 storey amenities building comprising open plan & cellular office facilities as well as mess and locker/ toilet/ shower areas.
Key Project Features
- 33kV, 25kV & 6.6kV HV substation/ switchgear & distribution
- HV/LV transformed power supplies
- Operational interlock system
- 25kV overhead lines (OLE)
- High level gas radiant heating
- BMS control system
- Electrical services distribution systems
- Internal and external lighting systems
- Lighting controls system
- Ventilation and cooling systems
- Compressed air
Design Services Provided
- New Station building internal & external services to reflect Network Rail, London Midland vision.
- Integration and solutions for all M&E services and associated Telecoms & CIS supplies.
- Full survey of existing services to allow efficient decommissioning of existing station building services.
- Coordination of reconstruction works for platform 1 – canopy removed as part of station demolition works.
- Electrical Services for Footbridge – a single span bridge has been installed between platform 1 and 2 to replace the current footbridge.